(Yohkoh Operation Report) 07-Jun-97 (Sat) Y+2108 (days) KSC Tohban +-----------------------------+ Operation-------------------------------------+ |T. Magara | |Normal | |Y. Hanaoka | +------------+------------+------------+------+-+---+------------+------------+ | | PASS 1 | PASS 2 | PASS 3 | PASS 4 | PASS 5 | +------------+------------+------------+------------+------------+------------+ | PASS No. |970607-0515 |970607-0618 | |970607-0825 |970607-0929 | +------------+------------+------------+------------+------------+------------+ | Operation |Normal |SXT TBL WR | |OP WRITE |Normal | | | | | | | | +------------+------------+------------+------------+------------+------------+ | AOS(UT) |07:12:01 |08:55:31 | |12:21:46 |14:05:10 | | LOS(UT) |07:27:04 |09:10:30 | |12:36:29 |14:18:40 | +------------+------------+------------+------------+------------+------------+ | MAX.EL. |28.858 |69.946 | |64.757 |24.174 | | TIME |07:19:16 |09:02:10 | |12:28:41 |14:11:16 | +------------+------------+------------+------------+------------+------------+ |REP/RNG/ANT |REP/B->A |RNG/B->A | |RNG/B->A |REP/B->A | +------------+------------+------------+------------+------------+------------+ | DP-MODE |QT-H |QT-H | |QT-H->ACS-H |ACS-H | +------------+------------+------------+------------+------------+------------+ | COMMANDS |SXT CHK DIS |SXT CHK DIS | |SXT CHK DIS |TMX H REP | | |TMX H REP |TMX H REP | |TMX H REP |BDR PAUSE | | |BDR PAUSE |SXT CTL MAN | |OP STOP |S/X ANT A ON| | |SXT CHK ENA |SXT TBL WR | |OP WRITE |SBR A RNG | | |S/X ANT A ON|SXT TBL RE | |TCU MEM H |TMX H REP | | |SBR A RNG |DP BC 8C 05 | |BDR PAUSE |BDR PAUSE | | |SXT CHK DIS |SXT CTL AT | |SXT CHK ENA | | | |TMX H REP |SXT CHK ENA | |S/X ANT A ON| | | |BDR REC |S/X ANT A ON| |SBR A RNG | | | | |SBR A RNG | |SXT CHK DIS | | | | |SXT CHK DIS | |TMX H REP | | | | |BDR PAUSE | |ACS MOD H | | | | | | |OP START | | | | | | |BDR REC | | | | | | | | | | | | | | | | | | | | | | | +------------+------------+------------+------------+------------+------------+ |ERROR(S,D,B)|(OK,OK,OK) |(OK,OK,OK) | |(OK,OK,OK) |(OK,OK,OK) | +------------+------------+------------+------------+------------+------------+ | EVENT |none |none | |none |none | +------------+------------+------------+------------+------------+------------+ |OBS R(NS,EW)|101,67 |106,61 | |101,61 |100,63 | +------------+------------+------------+------------+------------+------------+ |IMG CHK(P/F)|done/done |done/done | |done/done |done/done | +------------+------------+------------+------------+------------+------------+ |SXT TBL VER | |970607 P2 AR| | | | | | |STD+LONG | | | | +------------+------------+------------+------------+------------+------------+ | GBO_MAIL |dispatched |dispatched | |dispatched |dispatched | +------------+------------+------------+------------+------------+------------+ |FFI EXPOSURE|Al.1 10.68s | |Al.1 10.68 s| | | | |AlMg 30.21s | |AlMg 30.21 s| | | +------------+------------+------------+------------+------------+------------+ | REFORMAT |done |done | |done |not yet | +------------+------------+------------+-----+------+-----+------+------------+ | COMMENT |OP START @pass P (12:32:59) |SUN ANG/TFSS|0.1090 - 0.1183 | +------------+-------------------------------+------------+-------------------+ 今日はお散歩の途中、アスレチック広場にでくわしました。木作りの建物によじ登った り、木の幹をスキップしたりして遊びました。人間ケーブルにもトライしようとしまし たが、淋しくなって止めました。(真柄)背もたれの取れかかっていた椅子の止めネジ が落ちているのを見つけたので直しました。しかしどの椅子も崩壊寸前ですな。(花岡)