(Yohkoh Operation Report) 20-Jun-97 (Fri) Y+2121 (days) KSC Tohban +-----------------------------+ Operation-------------------------------------+ |H.Imai | |SXT Table Write, OP Write | |H.watanabe | +------------+------------+------------+------+-+---+------------+------------+ | | PASS 1 | PASS 2 | PASS 3 | PASS 4 | PASS 5 | +------------+------------+------------+------------+------------+------------+ | PASS No. |970620-0102 |970620-0206 |970620-0309 |970620-0413 |970620-0516 | +------------+------------+------------+------------+------------+------------+ | Operation |NORMAL |SXT TBL WR |Zenith Pass |OP Write |NORMAL | | | | | | | | +------------+------------+------------+------------+------------+------------+ | AOS(UT) |00:58:14 |02:41:12 |04:23:19 |06:06:34 |07:49:19 | | LOS(UT) |01:10:14 |02:53:38 |04:23:20 |06:19:59 |08:02:50 | +------------+------------+------------+------------+------------+------------+ | MAX.EL. |18.379 |58.564 | Zenith |68.290 |27.610 | | TIME |01:03:55 |02:46:28 | ------ |12:30 |07:55:20 | +------------+------------+------------+------------+------------+------------+ |REP/RNG/ANT |REP/B |REP/RNG/B |REP/B->A |REP/RNG/B->A|REP/B->A | +------------+------------+------------+------------+------------+------------+ | DP-MODE |QT-H |QT-H |QL-H |QL-H |QT-H | +------------+------------+------------+------------+------------+------------+ | COMMANDS |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS | | |TMX-H-REP |TMX-H-REP |TMX-H-REP |TMX-H-REP |TMX-H-REP | | |BDR REC |SXT CTL MANU|BDR PAUSE |OP STOP | | | | |SXT TBL WR |SXT CHK ENA |OP WRITE #2 |SXT CHK ENA | | | |SXT TBL RE |<20mANT ROT>|TCU MEM H |S/X ANT-A ON| | | |DP BC 8C 05 |SXT CHK DIS | |SBR-A-RNG | | | |SXT CTL AT |TMX-H-REP |SXT CHK ENA |SXT CHK DIS | | | |BDR REC | |S/X ANT-A ON| | | | | |SXT CHK ENA |SBR-A-RNG |BDR REC | | | | |S/X ANT-A ON|SXT CHK DIS | | | | | |SBR-A-RNG | | | | | | |SXT CHK DIS |OP START | | | | | | |BDR REC | | | | | |BDR REC | | | | | | | | | | | | | | | | | | | | | | | | +------------+------------+------------+------------+------------+------------+ |ERROR(S,D,B)|(OK,OK,OK) |(OK,OK,OK) |(OK,OK,OK) |(OK,OK,OK) |(OK,OK,OK) | +------------+------------+------------+------------+------------+------------+ | EVENT |none |none |none |none |none | +------------+------------+------------+------------+------------+------------+ |OBS R(NS,EW)|(178,48) |(178,48) |(178,47) |(178,46) |(177,45) | +------------+------------+------------+------------+------------+------------+ |IMG CHK(P/F)|done/done |done/done |done/done |done/done |done/done | +------------+------------+------------+------------+------------+------------+ |SXT TBL VER |------------|970620P2ARS1|------------|------------|------------| | |------------|STD+LONG |------------|------------|------------| +------------+------------+------------+------------+------------+------------+ | GBO_MAIL |dispatched |dispatched |dispatched |dispatched |dispatched | +------------+------------+------------+------------+------------+------------+ |FFI EXPOSURE|Al.1 10.68s |Al.1 10.68s |----------->|----------->|----------->| | |AlMg 30.21s |AlMg 30.21s |----------->|----------->|----------->| +------------+------------+------------+------------+------------+------------+ | REFORMAT |done |done |done |done |not yet | +------------+------------+------------+-----+------+-----+------+------------+ | COMMENT |OP START @pass 4 (06:16:29) |SUN ANG/TFSS|0.1107-0.1198 | +------------+-------------------------------+------------+-------------------+ 今日は朝から台風一過の晴天に恵まれました。空も海も日差しも、夏そのものです。台 風が直撃して運用ができないかも、という昨日の心配も杞憂におわり、よかった。総務 への再三の電話攻撃により、本日再び乾燥機の修理をお願いしました。今度はどうやら 直った模様です。しかしいったいどこが悪かったのやら...(渡辺H)。台風の時、あの 猫の一家はどこへ避難してたのでしょう。今日も元気のようです。(今井)。