(Yohkoh Operation Report) 31-Jan-1998 (Sat) Y+2346 (days) KSC Tohban +-----------------------------+ Operation-------------------------------------+ |Ken Kobayashi | |Rocket Obs. | |Kuniko Hori | +------------+------------+------------+------+-+---+------------+------------+ | | PASS 1 | PASS 2 | PASS 3 | PASS 4 | PASS 5 | +------------+------------+------------+------------+------------+------------+ | PASS No. |Cancelled |980130-1133 |980130-1237 |980130-1340 |980130-1444 | +------------+------------+------------+------------+------------+------------+ | Operation |Maintenance |OP WRITE #14|SXT TBL WR |Normal |SXT TBL WR | | | | |HXT CAL | | | +------------+------------+------------+------------+------------+------------+ | AOS(UT) | |16:26:36 |18:09:17 |19:52:19 |21:35:09 | | LOS(UT) | |16:26:44 |18:23:26 |20:06:35 |21:48:36 | +------------+------------+------------+------------+------------+------------+ | MAX.EL. | |76.218 |(87.7) |54.240 |19.969 | | TIME | |16:32:16 |(18:15:28) |19:58:34 |21:41:20 | +------------+------------+------------+------------+------------+------------+ |REP/RNG/ANT | |REP//A->B |REP//A->B |REP//A->B |REP//A->B | +------------+------------+------------+------------+------------+------------+ | DP-MODE | |ACS-H |ACS-H/FL-H |ACS-H/QT-H |ACS-H/QT-H | +------------+------------+------------+------------+------------+------------+ | COMMANDS | |TMX H REP |TMX H REP |TMX H REP |TMX H REP | | | |OP STOP |SXT CTL MANU|S/X ANT B ON| | | | |OP WR #14 |MANU FL H |SBR B RNG |MOD CTL AT | | | |TCU MEM H |HXT A ON | |SXT CHK DIS | | | |ACS MOD H |HXT CAL ON | |SXT CTL MANU| | | |S/X ANT-B ON|SXT CHK DIS |MOD CTL AT |SXT TBL WR | | | |SBR B RNG |SXT TBL WR |SXT CHK DIS |SXT TBL RE | | | |OP START |SXT TBL RE | |DP BC 8C 05 | | | |BDR REC |DP BC 8C 05 |BDR REC |SXT CTL AT | | | | |SXT CHK ENA | |SXT CHK ENA | | | | |BDR PAUSE | |S/X ANT B ON| | | | |S/X ANT-B ON| |SBR B RNG | | | | |SBR B RNG | |SXT CHK DIS | | | | |TMX H REP | |BDR REC | | | | |HXT CAL OFF |<--- | | | | | |HXT A OFF |SXT CTL AT | | | | | |ACS MOD H |BDR REC | | +------------+------------+------------+------------+------------+------------+ |ERROR(S,D,B)| |(OK,OK,OK) |(OK,OK,OK) |(OK,OK) |(OK,OK,OK) | +------------+------------+------------+------------+------------+------------+ | EVENT | |none |none |none |none | +------------+------------+------------+------------+------------+------------+ |OBS R(NS,EW)| |(183,104) |(183,104) |(190,80) |(193,88) | +------------+------------+------------+------------+------------+------------+ |IMG CHK(P/F)| |(done,done) |(done,done) |(done,done) |(done,done) | +------------+------------+------------+------------+------------+------------+ |SXT TBL VER | | |980130 P3 | |980130 P4 | | | | |ARS0 ROCKET3| |ARS0 ROCKET4| +------------+------------+------------+------------+------------+------------+ | GBO_MAIL | |dispatched |dispatched |dispatched |dispatched | +------------+------------+------------+------------+------------+------------+ |FFI EXPOSURE| |AlMg 30.21 |<-- |<-- |<-- | | | |Al.1 10.68 |<-- |<-- |<-- | +------------+------------+------------+------------+------------+------------+ | REFORMAT | |done |done |done |done | +------------+------------+------------+-----+------+-----+------+------------+ | COMMENT |OP START @pass 2 (16:36:28) |SUN ANG/TFSS|0.1322-0.1541 | +------------+-------------------------------+------------+-------------------+ いよいよ XDT 打ち上げ当日です。 原さんにようこう運用に付きあって頂き、修正した SXTテーブルを5パスで上げました。全て順調のようです。それではロケット君、 よろしくお願いします!(Ken) XDT望遠鏡は太陽全面を鉄の輝線で数分間観測するそうです。SXT PFIは#8145,8146 にセットされました。さすが、原さん。熊谷さんと永田君は、徹夜で望遠鏡の真空引き を行ってました。今日の鹿児島も快晴です。打ち上げは本日午後1:30の予定です。(堀)