(Yohkoh Operation Report) 06-Nov-1998 (Fri) Y+ 2625(days) KSC Tohban +-----------------------------+ Operation-------------------------------------+ |Masamitsu Ohyama | |OP WRT, CCD HEATER OFF, TEC ON, SXT TBL WRT | |Masaki Hata | +------------+------------+------------+------+-+---+------------+------------+ | | PASS 1 | PASS 2 | PASS 3 | PASS 4 | PASS 5 | +------------+------------+------------+------------+------------+------------+ | PASS No. | 981106-0102| 981106-0206| 981106-0309| 981106-0413| 981106-0516| +------------+------------+------------+------------+------------+------------+ | Operation |OP WRT, CCD | TEC ON | SXT TBL WRT| Normal | Normal | | |HEATER OFF | | Zenith | | | +------------+------------+------------+------------+------------+------------+ | AOS(UT) | 00:58:09 | 02:41:27 | 04:23:46 | 06:07:16 | 07:50:04 | | LOS(UT) | 01:10:21 | 02:53:24 | 04:36:13 | 06:18:41 | 08:00:44 | +------------+------------+------------+------------+------------+------------+ | MAX.EL. | 19.630 | 55.405 | Zenith | 68.881 | 23.551 | | TIME | 01:04:28 | 02:47:04 | | 06:12:31 | 07:55:10 | +------------+------------+------------+------------+------------+------------+ |REP/RNG/ANT | REP/ B | REP/RNG/B | REP/ B->A |REP/RNG/B->A| REP/ B->A | +------------+------------+------------+------------+------------+------------+ | DP-MODE | QT-H |QT-H -> FL-H| QT-H | QT-H |QT-H -> FL-H| +------------+------------+------------+------------+------------+------------+ | COMMANDS |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS | | |TMX H REP |TMX H REP |TMX H REP |TMX H REP |TMX H REP | | |OP STOP |SXT CTL MAN |SXT CTL MAN |SXT CHK ENA |SXt CHK ENA | | |OP WRITE |TEC ON |SXT TBL WRT |S/X ANT A ON|S/X ANT A ON| | |TCU MEM H |DP DC EXEC |SXT TBL RE |SBR A RNG |SBR A RNG | | |SXT CTL MAN |SXT PWR AT |DP DC 8C 05 |SXT CHK DIS |SXT CHK DIS | | |TEC AT DIS |SXT CTL AT |SXT CTL AT |RST BAD BANK|RST BAD BANK| | |SXT CTL AT |RST BAD BANK|BDR PAUSE |DP DC EXEC |DP DC EXEC | | |OP START |DP DC EXEC |SXT CHK ENA |BDR REC |BDR REC | | |RST BAD BANK|BDR REC |<20mANT ROT>| | | | |DP DC EXEC | |SXT CHK DIS | | | | |BDR REC | |TMX H REP | | | | | | |SXT CHK ENA ------------| | | | | |S/X ANT A ON (Pass 3) | | | | | |SBR A RNG | | | | | |SXT CHK DIS DP DC EXEC | | | | | |RST BAD BANK BDR REC | | +------------+------------+------------+------------+------------+------------+ |ERROR(S,D,B)|(OK, OK, OK)|(OK, OK, OK)|(OK, OK, OK)|(OK, OK, OK)|(OK, OK, OK)| +------------+------------+------------+------------+------------+------------+ | EVENT | FLARE | FLARE | none | none | FLARE | +------------+------------+------------+------------+------------+------------+ |OBS R(NS,EW)| (176, 87) | (176, 87) | (173, 78) | (172, 73) | (171, 72) | +------------+------------+------------+------------+------------+------------+ |IMG CHK(P/F)| done/done | done/done | done/done | done/done | done/done | +------------+------------+------------+------------+------------+------------+ |SXT TBL VER | | |981106 P3 | | | | | | | ARS1 STD| | | +------------+------------+------------+------------+------------+------------+ | GBO_MAIL | dispatched | dispatched | dispatched | dispatched | dispatched | +------------+------------+------------+------------+------------+------------+ |FFI EXPOSURE|Al.1 2.67s| ---------> | ---------> | ---------> | ---------> | | |AlMg 30.21s| ---------> | 30.21s | ---------> | ---------> | +------------+------------+------------+------------+------------+------------+ | REFORMAT | done | done | done | done | done | +------------+------------+------------+-----+------+-----+------+------------+ | COMMENT |OP START @pass 1 (01:07:08) |SUN ANG/TFSS| 0.1389 - 0.1494 | +------------+-------------------------------+------------+-------------------+ 1) 1パス目にBDRがREADYで入感。1-2パス間で全面像保護(4ブロック分を3)が2回あった。 原因は渡辺先生経由で調査中。 2) CCDの温度は HEATER OFF, TEC ON 後 -21.00に。 3) パス2,5でKSCパス中にフレアが発生。 4) flare1 のディスクの問題は運用終了後に 相模原WSMさんが対処予定。 おぉ...今日のコメントはなんと真面目なことか。。(大山) 今日はなんかいろいろなことがありましたので、いいもの見させて頂きました。(秦)