(Yohkoh Operation Report) 18-May-99 (Tue) Y+2818 (days) KSC Tohban +-----------------------------+ Operation-------------------------------------+ |Taro Sakao | |SXT RECOVERY & TABLE WR / STT TIMER SET | |Ryotaro Haga | +------------+------------+------------+------+-+---+------------+------------+ | | PASS 1 | PASS 2 | PASS 3 | PASS 4 | PASS 5 | +------------+------------+------------+------------+------------+------------+ | PASS No. |990518-0411 | A S C A |990518-0618 | A S C A |990518-0825 | +------------+------------+------------+------------+------------+------------+ | Operation |OP #02 WRITE| |SXT TABLE WR| |STT TIMER | | |SXT RECOVERY| |ZENITH | | SET | +------------+------------+------------+------------+------------+------------+ | AOS(UT) |05:29:00 | |08:55:17 | |12:21:40 | | LOS(UT) |05:43:38 | |09:08:50 | |12:32:28 | +------------+------------+------------+------------+------------+------------+ | MAX.EL. |34.051 | |ZENITH | |14.597 | | TIME |05:36:12 | |------ | |12:26:39 | +------------+------------+------------+------------+------------+------------+ |REP/RNG/ANT |REP/RNG/B->A| |REP/B->A | |REP/B->A | +------------+------------+------------+------------+------------+------------+ | DP-MODE |QT-H | |QT-H | |QT-H/ACS-H | +------------+------------+------------+------------+------------+------------+ | COMMANDS |TMX-H-REP | |SXT CHK DIS | |SXT CHK DIS | | |OP STOP | |TMX-H-REP | |TMX-H-REP | | |OP #02 WRITE| |SXT CTL MANU| |ACS MOD H | | |TCU MEM H | |SXT TABLE WR| |BDR PAUSE | | | | |DP DC "8C05"| |S/X ANT-A ON| | |< SXT >| |SXT CTL AT | |SBR-A-RNG | | |< RECOVERY >| |BDR PAUSE | |TMX-H-REP | | | | |SXT CHK ENA | |ACP DATA SET| | |S/X ANT-A ON| |<20m ROT> | |"C1 01 FA 01| | |SBR-A-RNG | |S/X ANT-A ON| | 47 00 00" | | | | |SBR-A-RNG | |ACE BC EXEC | | |OP-START | |SXT CHK DIS | |ACP DATA SET| | |RST BAD BANK| |TMX-H-REP | |"A6 01 00 00| | |DP DC EXEC | |RST BAD BANK| | 00 00 00" | | |BDR REC | |DP DC EXEC | |ACE BC EXEC | | | | |BDR REC |-( Pass 5 )-|RST BAD BANK| | | | | |BDR REC |DP DC EXEC | +------------+------------+------------+------------+------------+------------+ |ERROR(S,D,B)|ER->OK,OK,OK| |OK,OK,OK | |OK,OK,OK | +------------+------------+------------+------------+------------+------------+ | EVENT |C9 FLARE | |NONE | |NONE | +------------+------------+------------+------------+------------+------------+ |OBS R(NS,EW)|(115, 29) | |(182, 44) | |(184, 32) | +------------+------------+------------+------------+------------+------------+ |IMG CHK(P/F)|DONE/DONE | |DONE/DONE | |DONE/DONE | +------------+------------+------------+------------+------------+------------+ |SXT TBL VER |---- | |990518 P3 | |---- | | | | |ARS2 DK+J017| | | +------------+------------+------------+------------+------------+------------+ | GBO_MAIL |DISPATCHED | |DISPATCHED | |DISPATCHED | +------------+------------+------------+------------+------------+------------+ |FFI EXPOSURE|Al12: 5.34 s| |Al.1: 1.34 s| | -------> | | |AlMg: 30.2 s| |AlMg: 30.2 s| | -------> | +------------+------------+------------+------------+------------+------------+ | REFORMAT |CMPLT. | |CMPLT. | |CMPLT. | +------------+------------+------------+-----+------+-----+------+------------+ | COMMENT |OP START @pass 1 (05:39:39) |SUN ANG/TFSS|0.1262 - 0.1470 | +------------+-------------------------------+------------+-------------------+ 昨日起きたSXTのエラーは、1パス目にリカバーしました。パス1入感前にC9のフレアが あり、「ようこう」は一部を観測した模様。「ようこう」打ち上げ時からあった、SXT チームのパンチャーが昨日壊れました(スプリングの金属棒が折れた)。代替品を総務 に依頼中。(坂尾) 下位ビット僕一人でも出来ました(チェックがかなりスローペース だったという噂も...)、とにかく今日はSXTエラーが直って良かったです。(羽賀)