(Yohkoh Operation Report) 07-Dec-99 (Tue) Y+3021 (days) KSC Tohban +-----------------------------+ Operation-------------------------------------+ |H.Sekiguchi | |OP WR #09,SXT TBL WR,STT TIMER SET | |K.Kumagai | +------------+------------+------------+------+-+---+------------+------------+ | | PASS 1 | PASS 2 | PASS 3 | PASS 4 | PASS 5 | +------------+------------+------------+------------+------------+------------+ | PASS No. | ASTRO-E | ASTRO-E |991207-0516 | ASCA |991207-0723 | +------------+------------+------------+------------+------------+------------+ | Operation | | |OP WR #09 | |STT TIM SET | | | | |SXT TBL WR | | | +------------+------------+------------+------------+------------+------------+ | AOS(UT) | | | 07:50:21 | | 11:15:48 | | LOS(UT) | | | 08:04:50 | | 11:29:05 | +------------+------------+------------+------------+------------+------------+ | MAX.EL. | | | Zenith | | 19.9915 | | TIME | | | | | 11:21:55 | +------------+------------+------------+------------+------------+------------+ |REP/RNG/ANT | | |REP/B->A | |REP/B->A | +------------+------------+------------+------------+------------+------------+ | DP-MODE | | | QT-H | |QT-H/ACS-H | +------------+------------+------------+------------+------------+------------+ | COMMANDS | | |SXT CHK DIS | |SXT CHK DIS | | | | |TMX H REP | |TMX H REP | | | | |OP STOP | |ACS MOD H | | | | |OP WR | |ACP DATA SET| | | | |TCU MEM H | |ACE BC EXEC | | | | |SXT CTL MAN | |ACP DATA SET| | | | |SXT TBL WR | |ACE BC EXEC | | | | |SXT TBL RE | |S/X ANT A ON| | | | |DP BC 8C05 | |SBR A RNG | | | | |SXT CTL AT | |RST BAD BANK| | | | |BDR PAUSE |------------|DP DC EXEC | | | | |SXT CHK ENA |RST BAD BANK|BDR REC | | | | |S/X ANT A ON|DP DC EXEC | | | | | |SBR A RNG |BDR REC | | | | | |SXT CHK DIS | | | | | | |TMX H REP | | | | | | |OP START | | | +------------+------------+------------+------------+------------+------------+ |ERROR(S,D,B)| | | (OK,OK,OK) | | (OK,OK,OK) | +------------+------------+------------+------------+------------+------------+ | EVENT | | | none | | none | +------------+------------+------------+------------+------------+------------+ |OBS R(NS,EW)| | | (168,170) | | (164,171) | +------------+------------+------------+------------+------------+------------+ |IMG CHK(P/F)| | | done/done | | done/done | +------------+------------+------------+------------+------------+------------+ |SXT TBL VER | | |991207 P3 | | ------ | | | | |ARS1 DARKCAL| | | +------------+------------+------------+------------+------------+------------+ | GBO_MAIL | | | dispatched | | dispatched | +------------+------------+------------+------------+------------+------------+ |FFI EXPOSURE| | |AlMg 30.21s | |AlMg 30.21s | | | | |Al.1 1.34s | |Al.1 1.34s | +------------+------------+------------+------------+------------+------------+ | REFORMAT | | | done | | done | +------------+------------+------------+-----+------+-----+------+------------+ | COMMENT |OP START @pass 3 ( 08:01:0) |SUN ANG/TFSS| 0.1419-0.1461 | +------------+-------------------------------+------------+-------------------+ 午前中にM5の組み立て現場を見学してきました。整備塔には2段目までのロケットが 既に組み立てられていました。いわゆる衛星規格という部品が外側にぶら下がっていた り、ロケットに書かれた「M」という文字に触ってみたりしました。整備塔の屋上 から見る観測所内もまた格別で良く晴れた太平洋上に種子島も見えました。(関口)