(Yohkoh Operation Report) 28-Jun-00 (Wed) Y+3225 (days) KSC Tohban +-----------------------------+ Operation-------------------------------------+ |Taro Sakao | |SXT Table WR x 2 | | | +------------+------------+------------+------+-+---+------------+------------+ | | PASS 1 | PASS 2 | PASS 3 | PASS 4 | PASS 5 | +------------+------------+------------+------------+------------+------------+ | PASS No. |000628-0205 |000628-0308 |000628-0411 |000628-0515 |000628-0618 | +------------+------------+------------+------------+------------+------------+ | Operation |OP #04 Write|SXT Table WR|Zenith |SXT Table WR|Normal | | | | | | | | +------------+------------+------------+------------+------------+------------+ | AOS(UT) |02:02:11 |03:44:56 |05:26:50 |07:09:36 |08:51:47 | | LOS(UT) |02:15:04 |03:57:22 |05:39:34 |07:21:33 |09:02:55 | +------------+------------+------------+------------+------------+------------+ | MAX.EL. |23.115 |63.325 |Zenith |59.212 |18.679 | | TIME |02:08:34 |03:50:35 | |07:14:53 |08:56:51 | +------------+------------+------------+------------+------------+------------+ |REP/RNG/ANT |REP/B |REP/RNG/B->A|REP/B->A |REP/RNG/B->A|REP/B->A | +------------+------------+------------+------------+------------+------------+ | DP-MODE |QT-H |QT-H |QT-H |QT-H |QT-H | +------------+------------+------------+------------+------------+------------+ | COMMANDS |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS | | |TMX-H-REP |TMX-H-REP |TMX-H-REP |TMX-H-REP |TMX-H-REP | | | | | | | | | |OP-STOP |SXT CTL MANU|BDR PAUSE |SXT CTL MANU|BDR PAUSE | | |OP #04 WRITE|SXT TABLE WR|SXT CHK ENA |SXT TABLE WR|SXT CHK ENA | | |TCU MEM H |SXT TABLE RE|<20 m ROT> |SXT TABLE RE|S/X ANT-A ON| | | |DP BC "8C05"|SXT CHK DIS |DP BC "8C05"|SBR-A-RNG | | |OP-START |SXT CTL AT |TMX-H-REP |SXT CTL AT |SXT CHK DIS | | | | | | |TMX-H-REP | | |RST BAD BANK|SXT CHK ENA |SXT CHK ENA |SXT CHK ENA | | | |DP DC EXEC |S/X ANT-A ON|S/X ANT-A ON|S/X ANT-A ON|RST BAD BANK| | |BDR REC |SBR-A-RNG |SX`BR-A-RNG |SBR-A-RNG |DP DC EXEC | | | |SXT CHK DIS |SXT CHK DIS |SXT CHK DIS |BDR REC | | | | | | | | | | |RST BAD BANK|RST BAD BANK|RST BAD BANK| | | | |DP DC EXEC |DP DC EXEC |DP DC EXEC | | | | |BDR REC |BDR REC |BDR REC | | +------------+------------+------------+------------+------------+------------+ |ERROR(S,D,B)|OK, OK, OK |OK, OK, OK |OK, OK, OK |OK, OK, OK |OK, OK, OK | +------------+------------+------------+------------+------------+------------+ | EVENT |none |none |none |none |none | +------------+------------+------------+------------+------------+------------+ |OBS R(NS,EW)|119, 201 |120, 043 |176, 037 |176, 037 |175, 038 | +------------+------------+------------+------------+------------+------------+ |IMG CHK(P/F)|done/done |done/done |done/done |done/done |done/done | +------------+------------+------------+------------+------------+------------+ |SXT TBL VER |--- |000628 P2 |--- |000628 P4 |--- | | | |ARS1 VLA TES| |ARS1 STD | | +------------+------------+------------+------------+------------+------------+ | GBO_MAIL |dispatched |dispatched |dispatched |dispatched |dispatched | +------------+------------+------------+------------+------------+------------+ |FFI EXPOSURE|AlMg: 5.34s |Be : 7.55s |(Pass 2) |Al12: 21.36s|--> | | | |Al12: 7.55s |Mg3: 7.55s |AlMg: 7.55s| | +------------+------------+------------+------------+------------+------------+ | REFORMAT |done |done |done |done |done | +------------+------------+------------+-----+------+-----+------+------------+ | COMMENT |OP START @pass 1 (02:11:25) |SUN ANG/TFSS|0.1209 - 0.1407 | +------------+-------------------------------+------------+-------------------+ Pass1受信中にS-3500にリブートがかかり、後半(02:09UT以降)のQLモニターは大型の端 末で行なった。消感チェックはNECの原さんにMS画面を読み上げてもらい、ダウンリンク データはA400からS-3500に落してもらう。FACOMさんによると、(S-3500のAVRの性能が落 ちているため)瞬停or電圧降下でリブートがかかったのでは、とのことだが・・。おそら く、地上系クラッシャーを自認する、しも○o○君の置き土産であろう。太陽活動は相変 わらず低調。GOESプロットは、地を這うような低空飛行(B5)である。(さ)