(Yohkoh Operation Report) 30-Jul-00 (sun) Y+3257 (days) KSC Tohban +-----------------------------+ Operation-------------------------------------+ |H. Ishizaki, | |Week End Operation, Eclipse(7/31) Operation. | |T. Miyawaki. | +------------+------------+------------+------+-+---+------------+------------+ | | PASS 1 | PASS 2 | PASS 3 | PASS 4 | PASS 5 | +------------+------------+------------+------------+------------+------------+ | PASS No. |000729-0824 |000729-0927 |000729-1030 |000729-1134 |000729-1237 | +------------+------------+------------+------------+------------+------------+ | Operation | 34m | Normal |SXT TBL WR |OP+OG WR | Normal | | | operation | |Zenith | | | +------------+------------+------------+------------+------------+------------+ | AOS(UT) |11:29:50 |13:11:53 |14:54:14 |16:36:02 |18:19:04 | | LOS(UT) |11:41:51 |13:24:01 |15:06:15 |16:48:30 |18:29:12 | +------------+------------+------------+------------+------------+------------+ | MAX.EL. |30.141 |78.301 | ---- |42.810 |13.051 | | TIME |11:35:31 |13:17:20 | ---- |16:41:41 |18:23:19 | +------------+------------+------------+------------+------------+------------+ |REP/RNG/ANT |REP/B->A |REP/B->A |REP/B->A |REP/RNG/A |REP/A | +------------+------------+------------+------------+------------+------------+ | DP-MODE |QT-H/ACS-H |ACS-H |ACS-H |ACS-H |ACS-H | +------------+------------+------------+------------+------------+------------+ | COMMANDS | |TMX-H-REP |TMX-H-REP |TMX-H-REP |TMX-H-REP | | | | |BDR PAUSE |OP STOP | | | | |BDR PAUSE |S/X ANT A ON|OP WR #12 |RST BAD BANK| | | |S/X ANT A ON|SBR A RNG |000729-1134 |DP DC EXEC | | | |SBR A RNG |TMX-H-REP | OP+OG2|BDR REC | | | |TMX-H-REP |BDR PAUSE |OG WR #12 | | | | | |20m ANT ROT |000729-1134 | | | | |RET BAD BANK|TMX-H-REP | OP+OG2| | | | |DP DC EXEC |SXT CTL MANU|TCU MEM H | | | | |BDR REC |SXT CHK DIS |ACS MOD H | | | | | |MANU QT H |OP START | | | | | |SXT TBL WR |RST BAD BANK| | | | | |SXT TBL RE |DP DC EXEC | | | | |------------|DP BC 8C05 |BDR REC | | | | |RST BAD BANK|ACS MOD H | | | | | |DP BC EXEC |SXT CHK ENA | | | | | |BDR REC |SXT CTL AT | | | +------------+------------+------------+------------+------------+------------+ |ERROR(S,D,B)| ---- |(OK,OK,OK) |(OK,OK,OK) |(OK,OK,OK) |(OK,OK,OK) | +------------+------------+------------+------------+------------+------------+ | EVENT | ---- | none | none | none | none | +------------+------------+------------+------------+------------+------------+ |OBS R(NS,EW)| ---- | (115,223) | (115,233) | (114,222) | (115.223) | +------------+------------+------------+------------+------------+------------+ |IMG CHK(P/F)| ---- | done/done | done/done | done/done | done/done | +------------+------------+------------+------------+------------+------------+ |SXT TBL VER | ---- | ---- |000729 P3 | ---- | ---- | | | ---- | ---- | ARS1 STD*| ---- | ---- | +------------+------------+------------+------------+------------+------------+ | GBO_MAIL | ---- |dispatched |dispatched |dispatched |dispatched | +------------+------------+------------+------------+------------+------------+ |FFI EXPOSURE|AlMg 5.34s |----------> |AlMg 5.34s |----------> |----------->| | |Al.1 1.34s |----------> |Al.1 1.34s |----------> |----------->| +------------+------------+------------+------------+------------+------------+ | REFORMAT | ---- | done | done | done | done | +------------+------------+------------+-----+------+-----+------+------------+ | COMMENT |OP START @pass 0 (4 ) |SUN ANG/TFSS| | +------------+-------------------------------+------------+-------------------+ 台風6号が九州南端に接近中。なんとか、スケジュールどおりに出来ました。石崎 BSアンテナ(食堂わき)の強風対策第1期工事(ひもで固定)を行いました。ある程度はもち こたえてくれるでしょう。今夜を乗り切る事ができれば、当分は大丈夫かと。第2期工事 では、ちゃんと固定される事を望みます。固定する土台所望。(宮脇)