(Yohkoh Operation Report) 30-Mar-01 (Fri) Y+3500 (days) KSC Tohban +-----------------------------+ Operation-------------------------------------+ | Y. Matsumoto | |OP WRT, SXT TBL WR | | | +------------+------------+------------+------+-+---+------------+------------+ | | PASS 1 | PASS 2 | PASS 3 | PASS 4 | PASS 5 | +------------+------------+------------+------------+------------+------------+ | PASS No. |010330-0928 |010330-1031 |010330-1134 | |010330-1341 | +------------+------------+------------+------------+------------+------------+ | Operation |OP WRT # 15 |SXT TBL WRT |Zenith | GEOTAIL |Normal | | | |Zenith | | | | +------------+------------+------------+------------+------------+------------+ | AOS(UT) |13:36:51 |15:18:34 |17:00:34 | |20:25:23 | | LOS(UT) |13:50:33 |15:32:37 |17:00:43 | |20:36:18 | +------------+------------+------------+------------+------------+------------+ | MAX.EL. |43.120 | --- | --- | |12.805 | | TIME |13:43:08 |zenith pass |zenith pass | |20:30:15 | +------------+------------+------------+------------+------------+------------+ |REP/RNG/ANT |REP/RNG/A |REP//A |REP//A->B | |REP//A | +------------+------------+------------+------------+------------+------------+ | DP-MODE |ACS-H |ACS-H |ACS-H | |ACS-H->QT-H | +------------+------------+------------+------------+------------+------------+ | COMMANDS |TMX H REP |TMX H REP |TMX H REP | |TMX H REP | | |OP STOP |SXT CTL MAN |<20m ant rot| |MOD CTL AT | | |OP WR #15 |MAN QT H |S/X ANT B ON| |SXT CHK DIS | | |TCU MEM H |SXT CHK DIS |SBR B RNG | |RST BAD BANK| | |ACS MOD H |SXT TBL WR |RST BAD BANK| |DP DC EXEC | | |OP START |SXT TBL RE |DP DC EXEC | |BDR REC | | |RST BAD BANK|DP BC "8C05"|BDR REC | | | | |DP DC EXEC |SXT CHK ENA | | | | | |BDR REC |ACS MOD H | | | | | | |SXT CTL AT | | | | | | |<20m ant rot| | | | | | |RST BAD BANK| | | | | | |DP DC EXEC | | | | | | |BDR REC | | | | | | | | | | | | | | | | | | | | | | | | | +------------+------------+------------+------------+------------+------------+ |ERROR(S,D,B)|(ok,ok,ok) |(ok,ok,ok) |(ok,ok,ok) | |(ok,ok,ok) | +------------+------------+------------+------------+------------+------------+ | EVENT |none |none |none | |none | +------------+------------+------------+------------+------------+------------+ |OBS R(NS,EW)|(129,35) |(178,90) |(174,77) | |(181,90) | +------------+------------+------------+------------+------------+------------+ |IMG CHK(P/F)|done/done |done/done |done/done | |done/done | +------------+------------+------------+------------+------------+------------+ |SXT TBL VER | --- |010330 P2 | --- | | --- | | | |ARS1 STD* | | | | +------------+------------+------------+------------+------------+------------+ | GBO_MAIL |dispatched |dispatched |dispatched | |dispatched | +------------+------------+------------+------------+------------+------------+ |FFI EXPOSURE|AlMg 5.24s |AlMg 5.34s | ---> | | ---> | | |Al.1 1.34s |Al12 5.34s | ---> | | ---> | +------------+------------+------------+------------+------------+------------+ | REFORMAT |done |done |done | |done | +------------+------------+------------+-+----+-----+---------+--+--+---------+ |OP START #1 (13:47:07)|TFSS|0.1427 |DRT-X,Y,Z|(0.1728 ,0.2398 ,-0.7334)| +------------+---------------------------+----+---------------+-----+---------+ 初の一人運用初日はなんとか無事に終了でほっとしています。3パス目では、新しい軌 道要素の若干の変更のために入感時刻が微妙に早まっていたようで、パス番号が変わっ ていたことを、入感準備確認でわかりちょっとヒヤヒヤしたことが今日の一番の出来事 でした。NECさんから、ちょうど毎時付近に入感時間がある場合は注意した方がいいと、 アドバイスを頂きました。今日、鹿児島市で桜が3分咲きだそうです。勝川くん、おつ かれさまでした。(松本)