SSOC Tohban Report for Week 34 (23 AUG - 29 AUG, 1993) Uchida, Kubo, and Akioka 30 Aug, 1993 0.General CCD bakeout was terminated at 24 Aug (UT). The 8 arc min. offset opinting has done on 25 Aug.(UT). 1.Solar Activity Solar Activity of this week was terribly low. No C-class flare could not be found. 2.SSOC Operations 2-1. SXT Table Changes Aug 23, Pass2(930822-1239) 930823 T1 P2 ARS2 CCD BAKE Aug 25, Pass4(930824-1444) 930825 T1 P4 ARS1 DARK CAL Aug 26, Pass2(930825-1134) 930826 T1 P2 DEEP CORONA Pass4(930825-1341) 930826 T2 P4 ARS1 STD+LONG 2-2. STT Timer Set STT timer was set at pass2 on 24 Aug. The next setting should be done on 31 Apr. 3.Error and Problems 3-1. SXT has no error in this week. 3-2. flare1's video circuit On 24 Aug.,the video circuit board was changed to new one by engineer of FIJITSU campany. The display of flare1 has successfully revived. 4.Special Operations and Calibrations 4-1.Terminate the CCD bake out The CCD bake out has been ternimated from 2-3 pass on 25 Aug. The new table was uploaded at pass4. 4-2.Offset pointing The 8' east west offset pointing was done from pass 2 to pass 4 on 26 Aug. 4-3. BCS CAL BCS Calibration was done in OP uploaded on 26 Aug,and at Pass 4 on 27 Aug. Before this calibration, BCS recovery was done at Pass 1 on 26 Aug following to request by BCS duty Toban. 4-4. SXT's ARS trouble The trouble of ARS Patrol was found by SXT observer's. Mr. Shimizu and others are now checking the Patrol data buffer. The Patrol buffer dump was executed at Pass1 and 2 on 28 Aug. 5.Hikitsugi 5-1. Tobans in week 35 SSOC Fukushima Ohyama KSC Ishido Kumagai 5-2. Next STT Timer SET 31 August (00JST on Tue) 5-3. Offset Pointing ??? 5-4 Terminator program Will be continued 5-5 BCS CAL ??? 5-6 Geotail Operation Due to the special operation of geotail on Sep 1, the Holiday of Yohkoh operation on W35 will be on 1 Sep (Wed). In weekend of W35, the operation will be done as usual weekday.