SSOC Tohban Report for Week 37 ( 13 SEP - 19 SEP , 1993 ) Sep 20, 1993 K. Akita and R. Kano 0.General In this week, Gyro Switching Test ( Y to S ) was done. Its results and the plan from W38 will be reported later. 1.Solar Activity Solar Activity of this week was very low but started to rise gradually. One C-class flare occurred on 16 Sep. 2.SSOC Operations 2-1. SXT Table Changes Sep 14, Pass2(930914-0514) 930914 T1 P2 ARS1 DARKCAL Sep 15, Pass2(930915-0514) 930915 T1 P2 DEEP CORONA Sep 15, Pass4(930915-0721) 930915 T2 P4 ARS1 STD+LONG 2-2. STT Timer Set STT timer was set at pass2 on Sep 14. The next setting should be done on Sep 21. 3.Error and Problems SXT has one error. BIT MAP ERROR occurred at pass1 on Sep 14. SXT was recovered by Yobi-C in the same pass. BSC has no error in this week. 4.Special Operations and Calibrations 4-1. Offset pointing The 8' east/west offset pointing was done from pass 2 to pass 4 on Sep 15. 4-2. HXT Fine Gain Change Sep 14, Pass1(930914-0410) OG 2E-35 were uploaded. Sep 14, Pass3(930914-0617) ROG 2E-35 were executed. 4-3. BSC Calibrations Sep 15, Pass4(930915-0721) BCS SITM CAL Sep 15, between Pass4 & 5 BCS Source CAL 4-4. Gyro Switching Test ( Y to S ) On Sep 16, we checked S gyro status and found that S gyro may be much better than Y gyro. For example, the drift rate of S- & Y-gyro are ~0.1 & ~5 deg/hour respectively. 5. DSN data no problem 6.Hikitsugi 6-1. Tobans in week 38 SSOC Ta.Watanabe, Shoji KSC Hiraoka, Takano 6-2. Next STT Timer SET Sep 21 6-3. Offset Pointing 8' east/west offpoint operations on Sep 22 6-4 Terminator program 6-5 Gyro Switching ( Y to S ) Y gyro will be substituted by S gyro today (Sep 20).