SSOC Tohban Report for Week 39 ( Sep 27 - Oct 3, 1993 ) 1993 Oct 4 S. Savy and J. I. Khan 0. General This week coordinated observations were done with Norikura on one day. Also an 8 arc min. E offset pointing was done on 29 Sep (JST/UT). 1. Solar Activity The solar activity this week was low - moderate. The GOES background level intensity for this week was just under C class. From the Yohkoh event listing 5 flares were observed in flare mode. 2. SSOC Operations 2-1. List of SXT Tables Uploaded Month Day Pass ID Table Name * Sep 27 Pass2(930927-0206) 930927 T1 P2 NORIK ARS2 V2 * Sep 27 Pass3(930927-0309) 930927 T2 P3 NORIK ARS2 V2 * Sep 27 Pass4(930927-0412) 930927 T3 P4 ARS1 STD+LONG Sep 27 Pass1(930927-1547) 930927 T1 P1 NORIK ARS2 Sep 28 Pass2(930928-0103) 930928 T1 P2 ARS1 DARK CAL Sep 28 Pass3(930928-0206) 930928 T3 P3 ARS1 STD Sep 28 Pass4(930928-0310) 930928 T4 P4 ARS1 DARK CAL Sep 29 Pass2(930929-0104) 930929 T1 P2 DEEP CORONA E Sep 29 Pass4(930929-0310) 930929 T2 P4 ARS1 STD Sep 30 Pass4(930930-0208) 930930 T1 P4 ARS1 STD+LONG Oct 03 Pass2(931003-1445) 931003 T1 P2 ARS1 STD 2-2. STT Timer Set The STT timer was set during the following Pass: Sep 28 Pass4(930928-0310) The next setting should be done on 4 Oct. 3. List of Errors The following errors occurred this week: Month Day Pass ID Type of Error When Recovered * Sep 27 Pass3(930927-0309) DP Error Pass2(930928-0103) Sep 29 Pass1(930929-1445) SXT Bitmap Error Pass1(930929-1445) Oct 01 Pass3(931001-0205) BCS Error Pass4(931001-0308) 4. List of Problems No problems. 5. Special Operations and Calibrations 5-1. Offset pointing The 8' east offset pointing was done from pass 2 to pass 4 on Sep 29. The purpose of this campaign was to observe the outer corona above NOAA region 7590. 5-2. SXT-Norikura Campaign The SXT-Norikura Campaign was done from pass 1 Sep 27 to the next pass, pass 2 on Sep 28. The purpose of this campaign is to estimate the differential emission measure of the solar corona using SXT and coronal-line observations. 6. DSN data No problem. 7. Hikitsugi Tasks On Oct 4 do STT Timer SET. Daily insert terminator commands in OP. 8. Tohbans for week 40 SSOC: Kozuka, Kato, Y. KSC: Takahashi, Noguchi * Last day of previous week's operation