SSOC Tohban Report for Week 42 ( 18 OCT - 25 OCT, 1993 ) S. Watari and F.Farnik (SSOC) G. Kawai and T. Sakao (KSC) 1.General The whole term was smooth and without any extraordinary cases. 2.Solar Activity Solar Activity for this week was generally low. Only two spikes over C-level were observed by GOES. The average GOES level in soft channel is around B1.5 now. 3.SSOC Operations 3-1. SXT Table Changes Oct 18, Pass2(931018-1031) 931018 T1 P2 ARS2 DARK CAL Oct 19, Pass2(931019-1032) 931019 T1 P4 ARS2 STD Oct 20, Pass2(931020-0929) 931020 T1 P2 ARS1 DEEP CORONA Oct 20, Pass4(931020-1136) 931020 T2 P4 ARS2 STD Oct 21, Pass2(931021-0930) 931021 T1 P2 ARS2 STD (later cancelled by Lemen-san) Oct 22, Pass2(931022-0927) 931022 T1 P2 ARS2 STD (later cancelled by Lemen-san) Oct 23, Pass2(931023-0928) 931023 T1 P2 ARS1 STD 3-2. STT Timer Set STT timer was set on 19 Oct. The next setting should be done on 26 Oct. 4.Special Operations and Calibrations 4-1. Offset pointing The 8' east/west offset pointing was done from pass 2 to pass 4 on 20 Oct. 4-2. HXT Gain change was done on 18 Oct. during pass 2. 4-3. HXT Calibration was done during three night time KSC passes. 931018-1134, 931019-1239, 931020-1032 4-4. BCS Calibration was done on 21 Oct. during pass 2. 5. DSN data The DSN schedule for Week 43 was reduced after cancellations of some passes due to Shuttle and TDRSS critical support (see e-mail from Joe Espinueva of 20 October). New DSN schedule for week 44 and 45 was prepared and the list of cancelled DNS connections was sent to RASM and DSN. 6. No specific errors or problems appeared durinig the term. Only the error no. 155 on the mainframe computer after saving and printing commands in OP editor frequently appears. 7. Hikitsugi (Messages for next tohbans): 7-1. Tohbans in week 43 SSOC N.Nitta, K.D.Leka KSC T.Sakao, Y.Hanaoka 7-2. Next STT Timer SET The STT timer is due to be set again on 26 Oct. 7-3. Offset Pointing 8' east/west offpoint operations on 27 Oct between passes 2 and 4. 7-4. Terminator program is to be continued. 8. Remarks Some errors in antena selection were consequently found in the "OP_FIRST _GUESS" outputs. The problem is studied by Lemen-san. New "terminator_commands" software was tested and succesfully used. Small modifications were done by Lemen-san. We prepared and sent by Fax to KSC this Monday command sheets after KSC tohbans' request. The last JPL Wk41 Weekly Report was coded and despite our request de-coded version is not yet here.