SSOC TOBAN REPORT FOR WEEK 28 (11 July to 18 July 1994) SSOC: Suematsu and Miyashita KSC: Watanabe_H and Bushimata 1. SOLAR ACTIVITY --------------------------------------------- Solar activity was low in this week. There occurred 16 flares above X-ray class B2; the largest was C6.0 of July 12 (0919UT, NOAA7746). 2. STANDARD OPERATIONS ---------------------------------------- 2.1 SXT table uploads JST day Table ID 11-Jul-94 940711 P4 ARS1 DKCAL 12-Jul-94 940712 P2 ARS1 S-OFFPNT [ROG 56h (S/C 8' SOUTH OFFPOINT)] 940712 P3 ARS1 STD+LONG [ROG 20h (S/C NORMAL)] 13-Jul-94 940713 P2 ARS1 STD+LONG 14-Jul-94 940714 P2 ARS1 STD+LONG 2.2 STT timer set was done on Monday, 11-July, and will be done again on Monday, 18-July. The tohbans for week may need to do another setting on 25 July. 3. SPECIAL OPERATIONS ---------------------------------------- 12-Jul ROG 56h(S/C SOUTH) (P2) ( Offset Pointing) ROG 20h(S/C NORMAL)(P3) 14-Jul DP error-record dump and reset 4. ERRORS AND PROBLEMS ---------------------------------------- 4.1 DP Error On 5th pass on July 13, DP error (code 81) was found by KSC tohban and successfully recovered on 1st pass on July 14. 4.2 Electric power down at KSC On July 16 (Sat), electric power supply unexpectedly stopped at KSC around 15:30 JST. It came up around 15:40, but the tracking of pass 2 (16:04-16:19) could not be carried out because of MS check-up. 4.3 S-band trouble Before the pass 5 on July 16 (Sat), 20m antena had a trouble (1st Lo fault) and was not recovered. This trouble prevented KSC tobans from using S-band. They carried out the tracking with X-band only and could not make repro. After the pass 5, the antena was recoverd, but the reason of this trouble is not known yet. 5. DSN COMMUNICATIONS ------------------------------------------ 5.1 DSN schedule delivery All schedule were normally delivered on time. 5.2 Re-transmission requests NONE 6. YOHKOH/ASCA PASS CONFLICTS --------------------------------- One KSC pass was lost during Week 28 because of ASCA conflict. (5th pass on 14-Jul). Week 29 also has an ASCA conflict on 18 22, and 23 July. Pass 5 on 18 and 23 July will be lost on W29. 7. Holiday Schedule --------------------------------- Yohkoh holiday schedule has been set through the beginning of September in such a way as to minimize the ASCA conflicts, but within our Sunday-holiday policy. Next holidays wii be on 24 July. 8. HIKITSUGI ITEMS --------------------------------- 8.1 Tobans for week 29 SSOC: Nakajima/Yuda KSC: Bushimata/Okubo 8.2 Yohkoh/ASCA pass conflicts At present, it is SSOC toban's job to negotiate with ASCA people for telemetry conflict resolution. There have been regular tohban-level meetings each Friday at 2:00 pm, including Ito, Zylstra, and Lemen, to work out the problems. 8.3 Katazuke Please delete all personal files that have accumulated in the yohkoh directories on flare11 and flare1. One can get a list of them by doing flare11% ls -lt | more for example. 8.4 New software Katano_san (brilliant NEC software engineer) has made new software that will replace ATTLOG. It will record both real-time offpoints and OP offpoints. She will also run this software. The tohbans should coordinate on this and run ATTLOG if necessary this week.