SSOC Tohban Report for Week 39 (26 September - 2 October 1994) KSC : K. Morimoto and H. Hara SSOC: S. Watari and T. Watanabe/ T. Shimizu 1. Solar and Human Activity------------------------------------------------ Solar activity was very low throuoghout the week 39. The NAOJ solar eclipse party departed for Chile on 2-Oct. 2. Standard Operation ------------------------------------------------------ 2.1 SXT Table Uploads JST day Pass NO. Table ID 27-Sep-94 Pass 2 '940926 P2 ARS0 XBP CAMP' Pass 4 '940926 P4 ARS1 CHROMO CAMP' 28-Sep-94 Pass 2 '940927 P2 ARS0 XBP CAMP' Pass 4 '940927 P4 ARS2 CHROMO CAMP' 30-Sep-94 Pass 1 '940929 P1 ARS0 XBP CAMP' Pass 3 '940929 P3 ARS2 CHROMO CAMP' 01-Oct-94 Pass 1 '940930 P1 ARS0 XBP CAMP' Pass 3 '940930 P3 ARS2 CHROMO CAMP' 2.2 STT Timer Set STT Timer was set on Tuesday (Pass 2 on 27-Sep-94). STT Timer was stopped on Wednesday (Pass 2 on 28-Sep-94). 3. Special Operation ------------------------------------------------------- 3.1 Coordinated campaigns There were two coordinated campains. The SXT tables for these were uploaded. a. 'Chromospheric Ejections and Coronal Loops' with B.Schmieder, PP.Mein, and L.V.Driel-Gesztelyi (The target region was AR7789.) b. 'Bright Point study' with K.Harvey (The target was the coronal hole in the NE.) 3.2 SXT HALT OPERATION A test of 'SXT HALT OPERATIN' was done at the third KSC contact on 30th. Expected SXT response was obtained. 4. Errors & Ploblem -------------------------------------------------------- 4.1 Disk trouble of flare1 Flare1 could not mount home directory because of disk trouble on 27th. This was fixed by running fsck-command for the disk. Some files were lost by this trouble. We thank to Syuto-san for reconstruction of the lost files. 4.2 Wrong PFI address in SXT table Wrong PFI addresses in the SXT tables were found at pass 2 and 4 on 28th when the tables were uploaded. Hara-san revised the table during the pass and uploaded the table again. It may attribute to a human error. 4.3 Typhoon No YOHKOH pass was lost fortunately. However, there were small effect. SXT tables for campains were not uploaded. A test of 'SXT HALT OPERATTION' was postponed until the following day. 4.4 Negotiation date for KSC/ASCA conflicts ASCA tohban receive their next week KSC-schedule on Thursday. 'Negotiate KSC/ASCA conflicts with Nagase san (x2611)' in YOHKOH CHECK LIST should be moved from Wednesday to Thursday. 5. DSN Communications ------------------------------------------------------ 5.1 DSN Strawman Schedule for week 42 There is no DSN conflict with ASCA in the Strawman schedlue for week 42. 6. YOHKOH/ASCA Pass Conflict ---------------------------------------------- Three KSC passes (Pass 5 of 26-Sep-94, 30-Sep-94, and 01-Oct-94) were lost in week 39 because of conflict with ASCA. Two passes (Pass 5 of 03-Oct-94 and 04-Oct-94) will be lost in week 40. 7. Holiday Schedule ------------------------------------------------------- The next holiday is on 09-Oct-94 (JST). (KSC tohban has to work 7 days a week.) 8. Hikitsugi Item --------------------------------------------------------- 8.1 Tohbans for Week 40 SSOC: Yamamoto and K. Suga KSC: H. Hara and H. Tonooka 8.2 STT Timer Set The next STT timer set should be done on Tuesday (04-Oct-94). 8.3 Passwords of three Mainframes All three Mainframe Passwords have to be changed on Monday. 8.3 E-mails E-mails to and from yohkoh@flare1 shoule be stored in weekly mail files. Please store E-mails of week 40 in "mail/mail_94_w40".