SSOC Tohban Report for Week 30_95 (25 July - 30 July 1995) SSOC : K.Morimoto, T.Watanabe KSC : T.Matsuda, M.Noguchi (SPU) (NAOJ) 1. Solar Activity --------------------------------------------------------- Though a few B-class activity was recognized in the GOES-plot, the solar activity was essentially at very low level. Period. 2. Standard Operations ---------------------------------------------------- 2.1 SXT Table Uploads : 3 tables -------------------------------------------------------------------------- KSC Time (start:JST=UT+9) Pass# Table ID -------------------------------------------------------------------------- 25-JUL-95 (06:48) 2 950724 P2 ARS1 DKCAL 26-JUL-95 (07:08) 3 950725 P3 ARS1 STD+LONG 28-JUL-95 (04:20) 2 950727 P2 ARS1 STD+LONG -------------------------------------------------------------------------- *A block command "BC 8C 05(HEX)" was also uploaded. This is for dumping SXT patrol images. 2.2 STT Timer Setting Set on 25 (Tue) July, Pass 2. Next STT Timer should be set on 1 (Tue) Aug. 3. Errors & Problems ------------------------------------------------------ A record in Yohkoh operation with no errors for ten consecutive days would be achieved on 30-JUL. 3.1 BCS Error. One BCS error was detected on 31 (Mon) during Pass 1. The BCS Recovery plan was carried out in the Pass 1 and Pass 2. 3.2 SXT Error. One SXT error (SXT bitmap error) was detected on 31 (Mon) during pass 2. The SXT Recovery plan was carried out in the Pass 2 and Pass 3. 4. DSN Communications ------------------------------------------------------ 4.1 DSN Strawman Schedule for W33 We cancelled 61 DSN contacts from the strawman schedule for W33. 4.2 DSN Forecast Schedule for W32 One cancellation was requested. 4.3 DSN Final Schedule for W31 We cancelled 13 DSN contacts from the final schedule for W31. 5. YOHKOH/ASCA/SFU Pass Conflicts at KSC ---------------------------------- For W30, 7 KSC passes were lost because of the conflicts with ASCA. For W31, we have given up 8 KSC passes. There will be no pass conflicts between Yohkoh/ASCA and SFU. 6. Special Operation------------------------------------------------------- 6.1 Offset Pointing (Terminator Images) 24-JUL-95 06:30 E08S17 24-JUL-95 08:17 E08S17 24-JUL-95 11:21 E08S17 25-JUL-95 03:34 E08S17 25-JUL-95 06:50 E08S17 27-JUL-95 02:35 E08S17 27-JUL-95 09:04 E08S17 27-JUL-95 13:54 E08S17 28-JUL-95 04:30 E08S17 28-JUL-95 09:20 E08S17 31-JUL-95 03:48 E08S17 31-JUL-95 11:55 E08S17 7. X-band turn on test at Goldstone An additional sequence(X-band on with low power) of OP commands ware required for X-band test at Goldstone, on July 31, 1995 DOY212/1555-1609. 8. Holiday Schedule ---------------------------------------------------- The next holiday passes are those early morning of Sunday, 6 Aug. 9. Attendance of the MON (Monday Operation Meeting) on 31 (mon) July Alexander, Culhane, Hara, Hudson, Kano, Khan, Morimoto, Nakagawa, Ogawara, Sawa, Weber. (alphabetical order) *********************************************************************** 10. Hikitsugi Items 10.1 Tohbans for Week 31 (July 31 - Aug 6) KSC : Noguchi, Watanabe_Te SSOC : Nakagawa, Hudson 10.2 STT Timer setting The next STT timer setting should be done on 1-Aug (Tue). 10.3 STS-69 SPARTAN Schedule Eastern Time Date Elapsed Time Launch 10:45 AM August 5 0/00:00 Spartan release 11:18 AM August 6 1/00:33 Spartan grapple 9:58 AM August 8 2/23:13 Landing 7:14 AM August 16 10/20:29 was cancelled. Launch of Endeavour is now targeted for no earlier than mid-August. ---------------------------END of REPORT--------------------------------