SSOC Tohban's Report for Week 28 ( 6 July - 12 July 1998) SSOC : Sawa, Suematsu KSC : Akiyama, Shiozawa 0. Meeting Attendance There is no WOM held on Monday, as most of us are away to COSPAR in Nagoya. ----------------------------------------------------------------------- 1. Solar Activity and significant operational event Solar activity of this period was low. There were several small C-class flares. ----------------------------------------------------------------------- 2. Standard Operations 2.1 SXT Table Uploads The following SXT tables were uploaded last week. ---------------------------------------------------------------- Pass ID Pass Table ID ================================================================ 980706-0723 1 980706 P1 ARS2 TRACE 980706-1033 4 980706 P4 DARKCAL 980707-0723 1 980707 P1 ARS2 TRACE 980707-1034 4 980707 P4 ARS1 STD 980708-0824 1 980708 P1 ARS1 STD 980709-0721 1 980709 P1 ARS2 TRACE 980709-0928 3 980709 P3 ARS1 STD ---------------------------------------------------------------- 2.2 STT timer setting STT timer was set at pass 2 (980706-0826) on July 6. 2.3 Calibration 2.3.1 HXT Calibration HXA calibration was done at pass2 (980707-0827) on July 7. 2.3.2 BCS Calibration none 2.4 Holiday schedule The holiday of week 28 was changed from 10 July to 12 July. 2.5 Flare 1 home-directory crash One of the hard-disks on flare1 workstaion has crashed on 4 July. It included the home-directory of the 'yohkoh' account. Most of the files younger than one-month old were lost. A whole Flare 1 system was replaced to Flare 21 machine last week. Now new Flare 1 seems to be working well. If you have any problems, please notice them to WS managers. -------------------------------------------------------------------------- 3. Errors and Problems 3.1 BCS Errors Pass 2, July 10 (980710-0825). Recovery on the same pass. 3.2 SXT Errors None ----------------------------------------------------------------------- 4. Special Operations ROG 20(HEX) was done at pass 1 (980710-0722) on July 10. ----------------------------------------------------------------------- 5. DSN Communications 5.1 DSN Schedule Passes were deleted by SSOC Tohbans as follows. ------------------------------------------------------------------- DSN Schedule Week Deleted Passes =================================================================== Final W29 10 passes deleted by SSOC Preliminary W30 1 pass deleted by SSOC Strawman W31 64 passes deleted by SSOC ------------------------------------------------------------------- 5.2 Data Transmission from DSN None ----------------------------------------------------------------------- 6. KSC Pass Conflicts and Schedule 6 passes were lost last week due to conflicts with the other space crafts. 2 passes will be lost this week due to conflicts with the other space crafts (HALCA, AKEBONO). ----------------------------------------------------------------------- 7. Hikitsugi Items 7.0 Urgent items. The OP for Monday night of 13 Jul, has not been transferred to KSC. Week 29 tohbans, please confirm the DSN dumps and do this transfer. 7.1 Tohbans for week 29 (13 July -19 July) SSOC : Shinohara, Shimizu KSC : Shiozawa, Kumagai 7.2 STT timer setting Should be done on schedule Monday, 13 July if possible. The Canopus tracking situation is good. 7.3 Holiday Schedule The holiday in week 30 will be on 19 (Sun) and 21 (Tue) July (JST). 7.4 Update on the Late Arrival of the Final Schedule from Wallops The final schedules for week 29 arrived on Thursday, as we had hoped. ===================================================================== || The following is the same as the previous week's report (except || || for some rewriting). || ===================================================================== 7.5 DSN selection by the program FMT_WALLOPS The SSOC tohbans should check the ACTIVITY column of the 7dayss-list to make sure that the keyword TKG PASS is not omitted or replaced with another term. This happened last week. The FMT_WALLOPS program searches for TKG PASS and willeliminate passes without this keyword. According to Wallops they will not use other comments in the ACTIVITY columun. But the SSOC tohbans should check this for the next few weeks just to make sure. 7.6 Pass Additions and Wallops Deletions At the meeting it was decided that for the Strawman schedule the SSOC tohbans should select the best DSN passes but, in addition, they should not delete any Wallops passes. After receiving the Preliminary schedule with JPL/DSN deletions, the unnecessary Wallops passes should be deleted. 7.7 DSN scheduling Since mid week 10, 1998, Wallops schedules all DSN passes instead of JPL. The system to communicate with Wallops is still under construction. For details, see the temporary manual in the file ~wallops/README file on flare20. All DSN-related software should be run from an IDL session in the flare20/wallops subdirectory. Please immediately report any problems with the DSN software or errors in the manual to Hudson san. (New week 25) Please retain all Wallops passes in the Strawman cancellation process. We have been informed by Wallops that this is OK. These passes are cancelled by NASA less frequently, so by doing this we avoid days with almost no coverage. 7.8 Bug in op_first_guess SSOC tohbans should be aware of a bug in op_first_guess, e.g., "% OP_START_END: Problem with detection of LOS/AOS/DSN Repro Events". If DSN-related software in the directory ~yohkoh/wallops does not work correctly, check to see if the files being used which you have obtained through ftp from Wallops (e.g., 7dayss.wNN) are written in the same format as the previous weeks' files. We experienced (week 25) some confusion about the timing of KSC AOS and the DAY OG. Please be careful. If there is an KSC-AOS NIGHT one step before the DAY OG, normally the two commands can simply be interchanged and the AOS command switched to DAY. 7.9 BDR trouble (See 'DP error' in "SSOC Tohban's Report for Week 02" in 1998.) A DP error (error code = 90 ->75) was found during the data dump at 980106-0411. 2 of 20 BDR blocks are not accessible. As a result, the capacity of BDR is at the moment nine-tenths that of the normal capacity. This error has not been recovered yet. Please note the special commands, RST BAD BANK DP DC EXEC now routinely appearing in the end of command sheets. This is part of the recovery attempt. 7.10 E-mail communications We rely upon e-mail more and more. For operations-related e-mail, it's hereby suggested that we make it a rule to ACKNOWLEDGE the receipt of any such e-mail message. This applies particularly among SSOC, SXT_CO, KSC and SXT_ST. 7.11 Long Range Schedule Arrangement for Planet-B Planet-B was launched on July 4, 1998 for the mission to Mars. During the flight operation (lasting for twenty six days before the launch window begins), the KSC 20-meter antenna system will be used. After the launch, Planet-B will be tracked by the USD 64m and the newly (to be) installed KSC 34m antenna. Tracking schedule during the flight operation interval will be negotiated among the five teams namely: AKEBONO, YOHKOH, ASCA, HALCA and Planet-B. (Tetsuya WATANABE,NAOJ) * For more information, see a filed report (written in Japanese). ----------------------------------------------------------------------- 8. Action Items (Same as last week's SSOC Report) 8.1 Further software development. Status CONTINUING. It would be greatly appreciated if the SSOC tohbans could recommend any software development that they think will save future tohbans time and which improves the reliability of their work. 8.2 Week-48-A/I-1 /Hudson/status AJAR. PRINT_OGALL still does not work well. Hudson will fix it next. After the corrections are made, these procedures should be incorporated into the tohban manual. === END ===