SXT CHIEF OBSERVER REPORT AND TABLE PLAN 3 April 1995 M. Weber SXT TABLE PLAN FOR WEEK 14 (2 Apr - 8 Apr 1995 JST) There are no coordinated campaigns planned for this week. The observing objectives of this plan are: - Standard observing table for most of the week. - Dark Calibration on Wednesday. - Continuation of terminator-offpointing campaign. This SXT Table Plan was prepared by Mark Weber for Lemen san. Therefore, it is VERY likely that some changes will be made to the plan during the week. Tohbans should be alert for faxes from the new Chief Observer. The SXT Table Plan for the week is as follows: KSC Time (start) in JST Pass Table ID Comments _____________(= UT + 9 hrs)______#_______________________________ Monday ************** NO TABLE UPLOAD ********************* Tuesday ************** NO TABLE UPLOAD ********************* Wednesday (04/05) 13:11 3 950405 P3 ARS1 DARKCAL Thursday (04/06) 11:47 3 950406 P3 ARS1 STD+LONG Friday ************** NO TABLE UPLOAD ********************* Saturday ************** NO TABLE UPLOAD ********************* Terminator-Offpointing: The terminator-offpointing endeavor will continue this week. The SSOC tohbans will be required to manually insert the terminator commands for the OP tables. Hudson san can instruct the new tohbans as to handling offpoints. Filter selection can be done by the Chief Observer in the SXT Tables. NOTE: This table plan is subject to change. -------------------------------------------- SXT CHIEF OBSERVER'S REPORT for w13-- 27-Mar-95 to 2-Apr-95 SXT INSTRUMENT STATUS The SXT instrument is in fine working order. CAMPAIGNS TERMINATOR OFFPOINTING CAMPAIGN Not much progress was made in building the terminator database this week. However, Hudson san and Chief Observer Weber had more fruitful discussions about the campaign, and their understanding has increased. Some e-mail correspondence with Lemen san has (hopefully) prepared him for the current state of the project. We expect much more progress to be made while he is Chief Observer this month. NO OTHER CAMPAIGNS IN W13. CONTINUING CONCERNS OP_FIRST_GUESS: It is important to the terminator offpointing campaign that OP_FIRST_GUESS be run for Week+1 by the SSOC tohbans when the orbital elements arrive. This was not done during this most recent week, so the Table Plan for this week is tentative. The SXT Chief Observer needs files produced by this program in order to prepare the SXT Table Plan for Week+1. The Chief Observer suggests that the Tohban Checksheet and Manual be updated to include this responsibilty. An alternative suggested by Freeland san would be to automate this job. Either method is acceptable to this Chief Observer, as long as it is implemented relatively soon (i.e. in the next week or so).