17 August 1996 Serge Savy SXT CHIEF OBSERVER'S REPORT AND TABLE PLAN SXT CHIEF OBSERVER'S REPORT for Week 33: 12-AUG-96 to 18-AUG-96 A lot of good luck is undeserved, but then so is a lot of bad luck. - A Cowboy's Guide To Life SOLAR ACTIVITY A small active region (AR7984) was visible on the disc last week, otherwise the Sun remained relatively quiet. SXT INSTRUMENT STATUS SXT continues to function well. A Bit Map error was detected on Pass 5 12-Aug-96, and recovered during the same pass. CAMPAIGNS Last week we started a campaign to observe the large scale structure of the solar minimum corona with SoHO (JOP044). This campaign is coordinated by Sarah Gibson and Douglas Biesecker, and will last about one month, until 12-September. For this campaign we took long exposure FFIs off-pointed 5 arcmins east for 2 visible orbits and 5 arcmins west for 2 visible orbits on 12 August and 16 August. Details on SoHO JOP 44 can be found at http://sohowww.nascom.nasa.gov/operations/campaigns/soho/JOP044-199608.txt http://sohowww.nascom.nasa.gov/operations/JOPs/jop044.html SEMINARS No seminar last week. SXT TABLE PLAN FOR WEEK 34 (19-Aug-96 to 24-Aug-96) The coronal structure campaign (JOP044 with SoHO) continues this week with 3 special observing periods according to the following prescription: visible orbits at S/C 5' W or E. Only long exposures (FFIs): Al.1 at 10 sec, AlMg at 30 sec SSOC Tohbans: The SXT CO will schedule the off-points for this campaign. The off-point plan for this week is: Tuesday 20-AUG-96 : s/c off-point WEST 5' for orbit between P2-3 20-AUG-96 : " WEST 5' for orbit between P3-4 Wednesday 21-AUG-96 : " EAST 5' for orbit between P2-3 21-AUG-96 : " EAST 5' for orbit between P3-4 Thursday: 22-AUG-96 : " WEST 5' for orbit between P3-4 A dark calibration table will be loaded on Monday, and the weekly diffusers included as part of a standard table on Tuesday. KSC Time (start) in JST Pass Table ID _____________(= UT + 9 hrs)______#_______________________________ Monday 19-AUG-96 15:33 3 960819 P3 ARS1 DKCAL Tuesday 20-AUG-96 12:27 2 960820 P2 ARS1 STD+LONG 20-AUG-96 15:52 4 960820 P4 ARS1 STD+DIFFU Wednesday 21-AUG-96 12:46 2 960821 P2 ARS1 STD+LONG 21-AUG-96 16:12 4 960821 P4 ARS1 STD Thursday 22-AUG-96 13:05 3 960822 P3 ARS1 STD+LONG 22-AUG-96 14:48 4 960822 P4 ARS1 STD *** Please note that this table plan may change *** Continuing requests: We request that KSC tohbans continue to dump a patrol image each time an SXT table is loaded to facilitate the study of optimizing ARS parameters for an awfully, awfully quiet period. SSOC TOHBAN, please fax the preliminary OP list to D-tou when it contains a terminator so that the Chief Observer can suggest which OG's to use.