6 January 1997 H Hudson SXT TABLE PLAN FOR WEEKS 1-2 (6-Jan-97 to 12-Jan-97) There are no formal campaigns that we know about yet for the near term in 1997. The dark-calibration table will be loaded on Saturday night (Jan. 4), as soon as we confirm that things are OK, and we will put up a test table for the long bakeout on Sunday night. KSC Time (start) in JST Pass Table ID _____________(= UT + 9 hrs)______#_______________________________ Monday 6-JAN-97 17:37 1 970106 P1 ARS1 TEST+DIF Tuesday 7-JAN-97 17:56 2 970107 P2 ARS2 BAKE *** Please note that this table plan may change during the week. *** Continuing requests: We request that KSC tohbans continue to dump a patrol image each time an SXT table is loaded to facilitate the study of optimizing ARS parameters during quiet times. SSOC TOHBAN, please e-mail any terminator schedule to the chief observer (sxt_co@isass0) so that he can decide about filters and offpoints.