1 February 1998 Hugh Hudson SXT CHIEF OBSERVER'S REPORT AND TABLE PLAN CHIEF OBSERVER'S REPORT for Week 5 26-Jan-98 to 1-Feb-98 SOLAR ACTIVITY Solar activity was low, with four C-class flares. The GOES background level hovered at C1-C2. SXT INSTRUMENT STATUS SXT continues to function well. No problems were reported. SXT SCIENCE For Web material see Weekly: ftp://isass0.solar.isas.ac.jp/pub/sxt_co/SXTweekly.html Index: ftp://isass0.solar.isas.ac.jp/pub/sxt_co/index.html 1997: ftp://isass0.solar.isas.ac.jp/pub/yohkoh_in_1997/1997.html This week's "science nugget" surveys the SXT data at the time of the successful XDT rocket launch. CAMPAIGNS The major activity during the week was preparation for the launch of the S520-CN rocket, scheduled for January 31, 04:30 UT. This involved four separate tables, the final one adjusted for coordinates by H. Hara from KSC. A special jet observation was carried out for two orbits, with no cooperation from the Sun this time. As usual. PERSONNEL Loren Acton departed. Hugh Hudson will be absent in week 6. Jim Lang arrived from Rutherford for a week's stay. SEMINAR L.W. Acton (MSU, Bozeman): "Solar Irradiance and Telescope Design" SXT TABLE PLAN FOR WEEK 98_06 (2-Feb-98 - 9-Feb-98) SXT Chief Observer: Nitta We have no identified campaign observations this week. The plan shows one special jet table upload, but this would depend upon jet occurrence. This week the antenna maintenance at KSC has ended and we have all of the standard real-time passes. ________________________________#_______________________________ JST Day UT Start Time Pass Table ID Saturday 30-JAN-98 18:09 3 980130 P3 ROCKET3 Sunday 31-JAN-98 18:27 3 980131 P3 ARS1 STD Tuesday 3-FEB-98 17:21 4 980202 P4 DARKCAL Tuesday 3-FEB-98 14:14 2 980203 P2 STD+DIF Wednesday 4-FEB-98 14:32 2 980204 P2 JET Thursday 4-FEB-98 17:57 4 980204 P2 ARS1 STD Thursday 5-FEB-98 13:07 2 980205 P2 ARS1 STD Friday 6-FEB-98 13:25 2 980206 P2 ARS1 STD Saturday 7-FEB-98 13:44 3 980207 P3 ARS1 STD Note that this plan is subject to change. Note also that the table names don't match very well because we are rotating past 00 h UT - our convention is to name the table based on the UT of pass 1 on that day. Continuing requests: SSOC Tohban: On the weekly visible diagram, please mark the official five passes first and then cross out those passes that will be given to other satellites. That way we can keep the numbering straight in the Yohkoh software system. SSOC Tohban: SXT operations do not currently include terminator off- pointing. It is unnecessary this week to ask the SXT Chief Observer for terminator off-pointing information. KSC & SSOC Tohbans: If any KSC passes are likely to be cancelled (for example due to a typhoon) or an SXT table cannot be uploaded for some reason, please telephone and e-mail the Chief Observer immediately. (sxt_co@isass0.solar.isas.ac.jp, copy to sxt_st@flare2.solar.isas.ac.jp).