8 February 1998 Nariaki Nitta SXT CHIEF OBSERVER'S REPORT AND TABLE PLAN CHIEF OBSERVER'S REPORT for Week 6 2-Feb-98 to 8-Feb-98 SOLAR ACTIVITY Solar activity was even lower than last week, with the GOES 1-8 A flux never reaching the C level. The soft X-ray flux was especially low on the morning of 6-Feb-98, after regions AR 8143, 8145 and 8146 rotated behind the west limb. We saw the emergence of at least two compact regions, AR 8150 and 8152. There were several B-class flares, and their frequency increased towards the weekend, presumably due to the growth of AR 8152. SXT INSTRUMENT STATUS We noticed another entrance filter opening that had occurred early on 24-Jan-98. See the top item in the calibration subdirectory of SHOW_PIX. The straylight level appears to have been stable since then. We are collecting terminator images to cope with the new era. Otherwise, SXT operations have been smooth without problems. SXT SCIENCE For Web material see Weekly: ftp://isass0.solar.isas.ac.jp/pub/sxt_co/SXTweekly.html Index: ftp://isass0.solar.isas.ac.jp/pub/sxt_co/index.html 1997: ftp://isass0.solar.isas.ac.jp/pub/yohkoh_in_1997/1997.html This week's "science nugget" surveys the SXT data for two large-scale events that occurred during the week. CAMPAIGNS There was no official campaign, but ran a special jet observing sequence on Friday. No success, as usual. PERSONNEL N. Nitta arrived for a one-week stay. D. McKenzie and H. Hudson are returning over the weekend. SEMINAR No seminar this week. SXT TABLE PLAN FOR WEEK 98_07 (2-Feb-98 - 9-Feb-98) SXT Chief Observer: McKenzie/Hudson We do not know of any coordinated observations for week 98_07, so depending on solar conditions, we may try the jet sequence again. ________________________________#_______________________________ JST Day UT Start Time Pass Table ID Monday 9-FEB-98 10:55 2 980209 P2 ARS1 STD Tuesday 10-FEB-98 14:39 4 980210 P4 DARKCAL Wednesday 11-FEB-98 09:48 2 980211 P2 JET Wednesday 11-FEB-98 13:14 4 980211 P4 STD+DIF Thursday 12-FEB-98 11:49 3 980212 P3 ARS1 STD Friday 13-FEB-98 08:41 2 980213 P2 ARS2 STD Saturday 14-FEB-98 08:59 2 980214 P2 ARS1 STD Note that this plan is subject to change. Continuing requests: SSOC Tohban: On the weekly visible diagram, please mark the official five passes first and then cross out those passes that will be given to other satellites. That way we can keep the numbering straight in the Yohkoh software system. SSOC Tohban: SXT operations do not currently include terminator off- pointing. It is unnecessary this week to ask the SXT Chief Observer for terminator off-pointing information. KSC & SSOC Tohbans: If any KSC passes are likely to be cancelled (for example due to a typhoon) or an SXT table cannot be uploaded for some reason, please telephone and e-mail the Chief Observer immediately. (sxt_co@isass0.solar.isas.ac.jp, copy to sxt_st@flare2.solar.isas.ac.jp).