10 July 1998 Hugh Hudson SXT TABLE PLAN FOR WEEK 98_28 (9-Jul-98 through 18-Jul-98) SXT Chief Observer: Hudson We intend to try to follow TRACE at least during the visible orbits. Note that the Chief Observer is going to COSPAR so there may be limited table activity during Week 29. ________________________________#_______________________________ JST Day UT Start Time Pass Table ID Friday no table uploads Saturday 11-JUL-98 09:10 1 980711 P1 ARS2 TRACE Saturday 11-JUL-98 14:17 4 980711 P4 ARS1 STD Monday 13-JUL-98 08:02 1 980713 P1 ARS2 DIFF Monday 13-JUL-98 13:10 4 980713 P4 ARS1 DKCAL Tuesday 14-JUL-98 10:01 2 980713 P2 ARS1 STD Friday 17-JUL-98 05:47 1 980717 P1 ARS2 TRACE Friday 17-JUL-98 10:54 4 980717 P4 ARS1 STD Saturday 18-JUL-98 06:03 1 980718 P1 ARS2 TRACE Saturday 18-JUL-98 11:12 4 980718 P4 ARS1 STD Note that this plan may change during the week. Continuing requests: KSC & SSOC Tohbans: If any KSC passes are likely to be cancelled (for example due to a typhoon) or an SXT table cannot be uploaded for some reason, please telephone and e-mail the Chief Observer immediately. (sxt_co@isass0.solar.isas.ac.jp, copy to sxt_st@flare2.solar.isas.ac.jp). SSOC Tohban: On the weekly visible diagram, please mark the official five passes first and then cross out those passes that will be given to other satellites. That way we can keep the numbering straight in the Yohkoh software system. SSOC Tohban: SXT operations do not currently include terminator off- pointing. It is unnecessary this week to ask the SXT Chief Observer for terminator off-pointing information. KSC Tohbans: In general flare mode supersedes table upload, ie if a flare is in progress please do not upload a new table, and contact the chief observer. Normally it is OK to go ahead with the planned table without change on the next pass, if it is available. Chief observers should keep an eye on this.