August 1, 1999 H. Hudson CHIEF OBSERVER'S REPORT for Week 31 25-Jul-99 to 1-Aug-99 GENERAL Activity remains high, with a major sigmoid region in the S at time of writing. Pat McIntosh predicts major flares, but he has been wrong a couple of times recently. The year 1999 continues without having shown us any X-class flares! Amazing. SXT TECHNICAL Nothing to report. The terminator cycle is almost complete for the new pointing target, and the Al.1 SFD's look reasonably good. A normal pointing update (pointing axis ~10" N) was carried out Saturday. On Friday the Chief Observer forgot to transfer the SXT table. The situation was recovered nicely by Kubo_san and the KSC tohbans. Thanks. SXT SCIENCE For Web material see Current Week: http://isass1.solar.isas.ac.jp/sxt_co/SXTweekly.html Current Week: http://isass1.solar.isas.ac.jp/sxt_co/990730.html Index: http://isass1.solar.isas.ac.jp/sxt_co/index.html This week's nugget deals with the very nice M-class flare of July 25, for which TRACE got Lyman-alpha, FeXXIV, and hot continuum observations; Yohkoh saw an extended impulsive phase plus an arcade and a mammoth eruption; SOHO saw the expected CME on the NW limb. CAMPAIGNS For more information on campaigns, see: http://sec.noaa.gov/solcoord/solcoord.html For SXT plans, see: http://isass1.solar.isas.ac.jp/sxt_co/sxt_future.html PERSONNEL Brian Handy returned to Montana after training at the lower temperatures of Nobeyama prior to departure. SEMINARS There were no seminars this week. SXT TABLE PLAN, WEEK 32 (1-Aug-99 to 7-Aug) No collaborations are planned during the coming week. Because the orbit and contact pass pattern are favorable, we will do two tables on Monday (Tuesday morning JST) and get the dark cal out of the way. ________________________________#_______________________________ JST Day UT Start Time Pass Table ID Sunday 1-AUG-99 21:06 4 990801 P4 ARS1 STD* Monday 2-AUG-99 17:55 2 990802 P2 ARS1 DARK* Monday 2-AUG-99 21:21 4 990802 P4 ARS1 DIFF* Tuesday 3-AUG-99 18:09 3 990803 P3 ARS1 STD* Wednesday 4-AUG-99 16:41 2 990804 P2 ARS1 STD* Thursday 5-AUG-99 20:21 4 990805 P4 ARS1 STD* Friday 6-AUG-99 17:10 2 990806 P2 ARS1 STD* Saturday 7-AUG-99 17:24 3 990807 P3 ARS1 STD* The (*) in a table name means that the UT date and the JST date don't match. This plan is subject to change. Continuing requests: KSC & SSOC Tohbans: If any KSC passes are likely to be cancelled (for example due to a typhoon) or an SXT table cannot be uploaded for some reason, please telephone and e-mail the Chief Observer immediately. (sxt_co@isass0.solar.isas.ac.jp, copy to sxt_st@flare2.solar.isas.ac.jp). SSOC Tohban: On the weekly visible diagram, please mark the official five passes first and then cross out those passes that will be given to other satellites. That way we can keep the numbering straight in the Yohkoh software system. SSOC Tohban: SXT operations do not currently include terminator off- pointing. It is unnecessary this week to ask the SXT Chief Observer for terminator off-pointing information. KSC Tohbans: In general flare mode supersedes table upload, i.e. if a flare is in progress please do not upload a new table, and contact the chief observer. Normally it is OK to go ahead with the planned table without change on the next pass, if it is available. Chief observers should keep an eye on this.