10-July, 2000 H. Hudson, B. Handy CHIEF OBSERVER'S REPORT for Week 28 3-Jul-00 through 9-Jul-00 GENERAL Activity increased again, to mid-C levels, but without resulting in major flares. Simnett might claim that there are too many active regions, and the corona won't allow flare build-up. However we've received a McIntosh alert regard AR 9077, now at E63 - a potential "super-region". SXT TECHNICAL SXT worked fine without apparent problems this week. No campaigns are planned for this week, so we propose to do a CCD bakeout for one day. If our previous experience bears out, this should boost solar activity significantly. SXT SCIENTIFIC For Web material see Current Week: http://isass1.solar.isas.ac.jp/sxt_co/000707.html Index: http://isass1.solar.isas.ac.jp/sxt_co/index.html This week's nugget contains ruminations about spiny arcades, with a recent example from June 2 now on the Yohkoh movie. CAMPAIGNS JOP 123 (DEM Analysis) continued through the weekend. For SXT plans, see: http://isass1.solar.isas.ac.jp/sxt_co/sxt_future.html For SXT completed campaigns, see: http://isass1.solar.isas.ac.jp/sxt_co/sxt_catalog.html PERSONNEL No changes. SEMINARS None. TELEMETRY DOWNLINKS Week Wallops Goldstone Canberra Madrid NASA Japan 25 31 4 0 4 39 30 26 29 3 7 2 41 26 27 28 1 3 1 33 27 28 30 0 1 0 31 31 SXT TABLE PLAN, WEEK 28-29 (06-Jul-00 - 16-Jul-00) The VLA/SOHO/SXT Campaign (JOP 128, DEM studies) runs week 28; no formal campaigns planned for week 29. ________________________________#_______________________________ JST Day UT Start Time Pass Table ID Monday AM 10-JUL-00 01:56 4 000709 P4 ARS1 DARK* Tuesday AM 10-JUL-00 19:16 1 000710 P1 ARS1 BAKE* Wednesday AM 11-JUL-00 22:47 3 000711 P1 ARS1 DIFF* Thursday AM 12-JUL-00 19:31 1 000712 P1 ARS1 STD* Friday AM 13-JUL-00 21:21 3 000713 P3 ARS1 STD* Saturday AM 14-JUL-00 21:29 3 000714 P3 ARS1 STD* * The ID reflects the UT date of the first pass. This table plan is subject to change. Continuing requests: KSC & SSOC Tohbans: If any KSC passes are likely to be cancelled (for example due to heavy snowfall) or an SXT table cannot be uploaded for some reason, please telephone and e-mail the Chief Observer immediately. (sxt_co@isass0.solar.isas.ac.jp, copy to sxt_st@flare2.solar.isas.ac.jp). KSC Tohbans: In general flare mode supersedes table upload, i.e. if a flare is in progress please do not upload a new table, and contact the chief observer. Normally it is OK to go ahead with the planned table without change on the next pass, if it is available. Chief observers should keep an eye on this. BAKEOUT COMMAND PLAN Tuesday pass 1 19:16 UT Load bakeout table "000710 P1 ARS1 BAKE*" pass 2 20:57 TEC off pass 3 22:39 heater on Wednesday pass 1 19:23 heater off pass 2 21:05 TEC on pass 3 22:47 load SXT table "000711 P1 ARS1 DIFF*" The last previous bakeout was December 10, 1999, for reference.