CHIEF OBSERVER'S REPORT for Week 50 3-Dec-00 through 10-Dec-00 H. Hudson GENERAL Solar activity existed, but there was only one M-class flare. SXT TECHNICAL Roll appeared to remain stable, but we had trouble with new normal pointing adjustments. This trouble probably is not in the hardware. See http://isass1.solar.isas.ac.jp/~hudson/scratch/pointing.gif. This plot shows that two ROG commands (Dec. 6 and Dec. 7) did not appear to change the pointing successfully. The reasons for this need clarification. SXT SCIENTIFIC For Web material see the science nuggets: Current Week: http://isass1.solar.isas.ac.jp/sxt_co/001208.html Index: http://isass1.solar.isas.ac.jp/sxt_co/index.html This week's nugget discusses "homology" in the context of the X-class flares of Nov. 24, 25, and 26. They were probably better described as "similar", rather than "homologous". CAMPAIGNS We supported both the MEOC campaign and a conflicting CDS campaign during this week. Because of target selection we could not get much PFI data for the latter. For SXT plans, see: http://isass1.solar.isas.ac.jp/sxt_co/sxt_future.html For SXT completed campaigns, see: http://isass1.solar.isas.ac.jp/sxt_co/sxt_catalog.html PERSONNEL H. Hudson departed for the AGU meeting and Christmas. SEMINARS No seminar was held this week because of frenetic Solar-B activity. TELEMETRY DOWNLINKS Week Wallops Santiago Goldstone Canberra Madrid NASA Japan 50 33 0 0 0 3 36 28 51 30 3 0 0 12 45 31 SXT TABLE PLAN, WEEK 51 (10-Dec-00 to 16-Dec-00) There are no formal campaigns scheduled for this week, although we are on the alert for sigmoid active regions. We plan to do a CCD bakeout as described below. ________________________________#_______________________________ JST Day UT Start Time Pass Table ID Monday AM 10-DEC-00 20:55 3 001210 P3 ARS1 DARK* Tuesday AM 11-DEC-00 17:36 1 001211 P1 ARS0 BAKE* Wednesday AM 12-DEC-00 21:03 3 001212 P3 ARS1 STD* Thursday AM 13-DEC-00 17:43 2 001213 P2 ARS1 DIFF* Thursday AM 13-DEC-00 21:07 4 001213 P4 ARS1 STD* Friday AM 14-DEC-00 19:29 3 001214 P3 ARS1 STD* Saturday AM 15-DEC-00 17:51 2 001215 P2 ARS1 STD* Sunday AM 16-DEC-00 17:55 3 001216 P3 ARS1 STD* A '*' means that the UT date of pass 1 differs from the JST date of the pass in question This table plan is subject to change. Continuing requests: KSC & SSOC Tohbans: If any KSC passes are likely to be cancelled (for example due to heavy snowfall) or an SXT table cannot be uploaded for some reason, please telephone and e-mail the Chief Observer immediately. (sxt_co@isass0.solar.isas.ac.jp, copy to sxt_st@flare2.solar.isas.ac.jp). KSC Tohbans: In general flare mode supersedes table upload, i.e. if a flare is in progress please do not upload a new table, and contact the chief observer. Normally it is OK to go ahead with the planned table without change on the next pass, if it is available. Chief observers should keep an eye on this. BAKEOUT COMMAND PLAN Tuesday pass 1 11/17:36 UT Load bakeout table "001211 P1 ARS0 BAKE*" pass 2 11/19:17 TEC off pass 3 11/20:59 heater on Wednesday pass 2 12/19:21 UT heater off pass 3 12/21:03 TEC on pass 3 12/21:03 load SXT table "001212 P3 ARS1 STD*"