CHIEF OBSERVER'S REPORT for Week 4 22-Jan-01 through 28-Jan-01 A. Takeda GENERAL The GOES backgound has been less than C-level on the average, but some gorgeous eruptive events can be seen in SoHO/LASCO images in the weekend. One can find some of the corresponding features in our FFIs. M-class flares reported in this week are on ARs 9311(M1.0, 24th), 9325(M1.0, 26th), and 9313(M1.5, 28th). SXT TECHNICAL No serious errors. The normal pointing was updated on 26-Jan-01 JST at pass 1(010125-1445). SXT SCIENTIFIC For Web material see the science nuggets: Current Week: http://isass1.solar.isas.ac.jp/sxt_co/010126.html Index: http://isass1.solar.isas.ac.jp/sxt_co/index.html The newest nugget(by HSH) entitled "A Coronal Conveyor Belt?" discusses about a coronal loop linking two regions and conveying some hot plasma from one to another. CAMPAIGNS No campaigns during the interval and none planned at present. We remain on the alert for sigmoids as a "target-of-opportunity". For SXT plans, see: http://isass1.solar.isas.ac.jp/sxt_co/sxt_future.html For SXT completed campaigns, see: http://isass1.solar.isas.ac.jp/sxt_co/sxt_catalog.html PERSONNEL G. Slater arrived on 25th. SEMINARS No seminar. TELEMETRY DOWNLINKS Week Wallops Santiago Goldstone Canberra Madrid NASA Japan 04 25 6 0 3 3 37 25 05 25 7 7 0 12 51 27 SXT TABLE PLAN, WEEK 5 (28-Jan-01 through 3-Feb-01) There are no formal campaigns scheduled for this week, although we are on the alert for sigmoid active regions. We are reconsidering the way to take super-long-exposure images in the period of solar maximum. These images are used for an XBP research by Nakakubo & Hara for years. As a trial, we will upload two tables a day this week. ________________________________#_______________________________ JST Day UT Start Time Pass Table ID Monday AM 28-JAN-01 19:05 1 010128 P1 cancelled! Monday AM 29-JAN-01 00:11 4 010128 P4 cancelled! Tuesday AM 29-JAN-01 17:29 1 010129 P1 ARS1 DIFF+XBP* Tuesday AM 29-JAN-01 22:33 4 010129 P4 ARS1 STD* Wednesday AM 30-JAN-01 17:31 1 010130 P1 ARS1 STD+XBP* Wednesday AM 30-JAN-01 20:54 3 010130 P3 ARS1 STD* Thursday AM 31-JAN-01 19:16 2 010131 P2 ARS1 DARK* Thursday AM 31-JAN-01 22:40 4 010131 P4 ARS1 STD* Friday AM 1-FEB-01 15:57 1 010201 P1 ARS1 STD+XBP* Friday AM 1-FEB-01 21:01 4 010201 P4 ARS1 STD* Saturday AM 2-FEB-01 15:59 1 010202 P1 ARS1 STD+XBP* Saturday AM 2-FEB-01 21:04 4 010202 P4 ARS1 STD* The date-part of a table ID reflects the UT date of the pass 1. A '*' signifies that the date of the table ID does not agree with the JST date of the pass in question. This table plan is subject to change. Continuing requests: KSC & SSOC Tohbans: If any KSC passes are likely to be cancelled (for example due to typhoons) or an SXT table cannot be uploaded for any reason, please telephone and e-mail the Chief Observer immediately. (sxt_co@isass0.solar.isas.ac.jp, copy to sxt_st@flare2.solar.isas.ac.jp). KSC Tohbans: In general flare mode supersedes table upload, i.e. if a flare is in progress please do not upload a new table, and contact the chief observer. Normally it is OK to go ahead with the planned table without change on the next pass, if it is available. Chief observers should keep an eye on this.