Documentation > SXT Observation Notes > this page |
Image name: BDR_optimization.png (click image to enlarge)
Image size: 5.39800 KB (512x512)
Date submitted: 17-Jul-1997
Example of the BDR optimization installed by Jim in OP_FIRST_GUESS in spring 1997. You can see the switches from high to medium (short lines) in this GOES_TEK display; these switches are programmed in at SAA times. Also caught in the act was a terminator image at about 20:00 and a switch to high rate prior to the first KSC contact. HSH 17-jul-97