Documentation > SXT Observation Notes > this page

BDR Optimization

Image name: BDR_optimization.png (click image to enlarge)
Image size: 5.39800 KB (512x512)
Date submitted: 17-Jul-1997

Description:
Example of the BDR optimization installed by Jim in OP_FIRST_GUESS
in spring 1997. You can see the switches from high to medium (short
lines) in this GOES_TEK display; these switches are programmed in
at SAA times. Also caught in the act was a terminator image at about 
20:00 and a switch to high rate prior to the first KSC contact.

HSH 17-jul-97


To the YLA Guide front page with side-frame
To contact us: